SV is a subset and crucial component of earned value management (EVM), a tool for measuring project progress across the scope, cost, and schedule categories. Schedule variance is not to be confused with cost variance, which is the difference between the project’s earned value and actual cost. It is a calculation of data representing the deviation of actual time against estimated time. Schedule variance is defined as an indicator of whether a project is on track, ahead of, or behind schedule.